Production site Changzhou
Production site Changzhou
As one of the turbomachinery manufacturers in China, the Company has introduced MAN Energy Solutions’ state-of-the-art technology in Changzhou plant and offers products and services covering a wide range of compressors, steam turbines, turbochargers, controllable pitch propellers and slide bearings. To better serve customers, our specialists provide round-the-clock after-sales service for Turbomachinery and Engines.
The Company has the professional team integrating specialists in Engineering, Procurement, Planning, Production and Quality Management, who are working closely with our Competence Centers in Europe, continuously striving to optimize the design and manufacturing of our tailor-made products. We practice a well-established localization concept, which integrates our Changzhou workshop with all our technological capabilities in European product centers, and we are thus able to offer innovative and competitive products to our customers.
Technology solutions from Changzhou
Fully adaptable to your needs, our integrally geared compressors typically stand for high efficiency and a speedy return on investment in a wide range of applications. This multi-shaft centrifugal compressor allows for up to five pinions, depending on your individual requirements.
- Individually selectable impeller speed for optimal flow and costs
- Up to three combined applications within one casing
- Sealing and intercooling opportunities
These unique integrated coolers allow for extremely high efficiency and operational robustness. Their core application is in air separation plants.
- Suitable for steam turbine direct drive
- Low energy consumption
- Compact (cooler bundle integrated in casing)
These compressors sit at the center of several high-volume flow industrial applications such as in blast furnace blowers, propane dehydrogenation, wind tunnels and others.
- Superior surge robustness
- Outstanding efficiency
- Also applied in fluid catalytic cracking (FCC)
Barrel compressors
Compressors with vertical split line are the first choice in oil & gas. Proven and extraordinary robust design lead to record high reliability. The design is ready for electric motor, steam turbine or gas turbine driver.
- In case of process changes, very short downtime for replacing the bundle
- Optimized design to perform routine maintenance interventions
- Adaptability to process changes (modification of aerodynamic gas path)
MAN Energy Solutions Changzhou assembly and test controllable pitch propellers. The MAN Alpha CP propeller designs effectively cover a power range up to 40,000 kW per shaft line.
Career and training offers
Address & local contacts
MAN Energy Solutions Changzhou
Fengming Road 9,
Jiangsu Wujin High-Tech Industrial Zone,
213164, Changzhou, P.R. China
T +86 519 86227888
Managing Director of MAN Energy Solutions China - Stjepan Kucifer
Fengming Road 9, Jiangsu Wujin High-Tech Industrial Zone, 213164, Changzhou, P.R. China
Email: Stjepan.Kucifer@man-es.com
T +86 519 8622 7001
Head of Industries China - Bolan Li
10F, 1001-1008 CYTS Plaza, Dongzhimen South Avenue, Dongcheng Dist. 10007, Beijing,P. R. China
Mail: li.bolan@man-es.com
T +86 13810011663
Head of Sales Industrial Gases, LAES &CAES - Tony Wang
1001, CYTS Plaza, No. 5, Dongzhimen South Avenue, Dongcheng District, Beijing, China, 100007
Email: wang.nan@man-es.com
T +86 10 58156511-555
Head of Sales for Mid- Downstream & BF, CCS & CCUS - Liming Zuo
10F, CYTS Plaza, No.5 Dongzhimen South Avenue, Beijing, P. R. China
Email: liming.zuo@man-es.com
T +86 139 11468744
Head of sales in Upstream, LNG, PTA and Methanol application in China, ETES - Bin Sun
10F,1001-1006 CYTS Plaza, Dongzhimen South Avenue,Dongcheng Dist. 100007, Beijing, P.R,China
Email: bin.sun@man-es.com
T +86 18961193163
Head of Paper Industry - Zhongliang Zhu
Xinxi Building No.1, Zhao Lou Road 3576, Pujiang Town, Minhang District, Shanghai. P.R. China
Email: zhongliang.zhu@man-es.com
T +86 13501957512
HR BP for Production - Emily Kong
Fengming Road 9, Jiangsu Wujin High-Tech Industrial Zone, 213164, Changzhou, P.R. China
Email: yun.kong@man-es.com
T +86 519 8622 7033
Head of Project Management Industries - Peng Ren
10F, 1001-1008 CYTS Plaza, No.5 Dongzhimen South Avenue, Dongcheng Dist. 100007, Beijing, P. R. China
Email: ren.peng@man-es.com
T +86 10 5815 6511 * 886, +86 138 1068 9409
Head of Field Service Coordination - Lirong Zhu
Xinxi Building No.1, Zhao Lou Road 3576, Pujiang Town, Minhang District, Shanghai. P.R. China
Mail: zhu.lirong@man-es.com
T +86 15921635576
History of Changzhou site
The plant was established on Jan. 24, 2007 from a green field.
On Nov. 18, 2008 a grand opening ceremony took place in occasion with MAN 250 Anniversary.
The production and service workshop phase II was opened on May 18, 2011, integrating 6 business areas into Changzhou.

2007 - Groundbreaking
2008 - Phase 1 completed
2010 - First RIKT delivery
2011 - First exported compressor; phase 2 completed; First PGSK; Renk bearings production; Turbocharger production
2012 - RIKT & ST Testbed completion; first ST delivery
2014 - First RG delivery
2017 - First AV delivery; first GT packing
2018 - RG testbed completed
2019 - 100th RIKT delivery
2020 - CPP assembly; first RB
2021 - First MAX1 AG